GLOBAL ENERGY MANAGEMENT
Among the work carried out by our professionals, the following projects stand out.
CANCÚN INTERNATIONAL AIRPORT (ASUR)
Measures taken on facilities
- Pre-audit
- Energy Consumption Analysis
- Diagnosis. Identification of inefficiencies
- Facilities Status
- HVAC
- illumination
- Thermal Envelope
- Identification of lines of action and improvement aimed at achieving potential savings.
- Inventory of major energy consuming facilities
- Knowledge, analysis
- Maintenance optimization
- Determine the starting point for performance improvement and detection of MAE's
- Operational analysis of the facilities
- Detection of MAEs:
- Sealing and infiltration control
- Improvement of the thermal properties of the envelope
- UMA-oriented maintenance of EE
- Replacement of bad type units.
- Restore and implement centralized control in the installation
- Setpoint temperature adjustment
- Control of lighting circuits
- Power Factor Correction
- Photovoltaic system
- Optimization of the information screens schedule
- Detection of MAEs: